Pokemon: My Trainer Simulator

Chapter 794 - 518: The Critical Path_3

  • Next Chapter

Chapter 794: Chapter 518: The Critical Path_3

On the big screen.

The score beneath Harry’s avatar was deducted.

"How can this happen!"

He gritted his teeth. Cacturne was the Pokémon he chose specifically to deal with the Altered-color Milotic, wanting to overpower it with momentum and gain an attribute advantage.

Who would have thought the Altered-color Milotic was not afraid but excited!

Such a backfiring moment would certainly not escape the sharp eyes of the four judges, who unanimously decided to deduct his score.

Harry was so angry his face nearly turned green!

What are you excited about?

"No way!"

He was heartbroken over the points deducted and ordered, "Mengge! Use Seed Machine Gun!"

"Noh-ze!"

Cacturne took a deep breath, and from the numerous holes on its face, like a scattergun, spewed out a large number of emerald-green light bullets, creating a shrill sound from air friction.

Its attack was quite swift, and the power seemed impressive.

Unfortunately, it wasn’t enough.

"Surf!"

Boom!

A giant wave rose like a high wall, and the emerald-green light bullets hitting it seemed to strike firm satin, unable to pierce through.

The Altered-color Milotic behind the giant wave suddenly raised its tail fin and slapped the wave, causing it to roll and surge towards Cacturne!

Since deciding to quickly take down Harry, it’s time to reveal its trump card appropriately.

Perfect.

Use Cacturne to test the results learned from Adam over the past few days!

Harry, unable to see Baimu opposite, was a bit nervous and shouted:

"Mengge, use Iaido Slash! Cut open the wave!"

Faced with the surging wave, Cacturne immediately raised its arms, and the dark green spikes on its surface emitted white light and extended, waving them like sharp blades.

But before the light spikes could touch the wave, the Altered-color Milotic in the pool suddenly took a deep breath.

"Blizzard!"

Whoosh!

Countless white snow pellets shot forward, catching up with the rolling wave in an instant with the help of the wind, rapidly freezing its upper half into a huge ice block!

"Noh-ze!"

Cacturne watched the towering ice block turn into a dark shadow and tilt down, almost scared to death, frantically waving its arms to try cutting it into fragments.

Swish swish swish!

The white light flickered constantly, dazzling to the point of eye soreness.

Unfortunately, despite its efforts, it still couldn’t completely shatter the ice block, which broke into football-sized pieces and crashed down on it.

Bang bang bang bang bang—

Ice fragments scattered everywhere and completely buried it.

"Mengge!" Harry screamed, covering his cheeks, ignoring the fact that nearly half of his score was about to be deducted, repeatedly shouting for it to break free from the ice and snow.

Meanwhile.

Under Baimu’s direction, the Altered-color Milotic quickly swam forward, "Frozen Beam!"

"Mee-row~"

It opened its mouth, and ice-blue lightning surged, shooting out to forcibly reinforce the surrounding ice and snow hardness for Cacturne trying to get up.

The helpless Cacturne immediately turned into a large ice sculpture.

"The final blow, Water Cannon!"

Baimu waved his hand.

Azurite water streams gathered from all directions, spraying out with the fierce movement of the Altered-color Milotic’s light blue fin, and a large water column heavily struck the ice-entombed Cacturne!

Bang!

The latter flew directly backwards along with the ice block, crashing hard onto the wall of the spectator stand.

As the ice block shattered, it revealed its eyes like black circles.

"Mee-row!!"

The Altered-color Milotic proudly lifted its chin, its heroic posture drawing cheers and applause from many fans.

Beep—

The whistle sounded, completely deducting almost half of Harry’s remaining score.

With more than two minutes left on the countdown.

The match ended.

Baimu calmly bowed in thanks.

Countless people in the preparation room watched this scene with great emotion.

Strong!

Too strong!

If you find any errors (non-standard content, ads redirect, broken links, etc..), Please let us know so we can fix it as soon as possible.

Report

Use arrow keys (or A / D) to PREV/NEXT chapter