Homo Sapiens

Chapter 391 - 388: A Difficult Problem

  • Next Chapter

East Japan, Tokyo.

May 11th.

Due to the influence of the Tokyo Fungus, biological research institutions around the world were now conducting in-depth studies on its various properties.

According to currently disclosed information, a relatively comprehensive set of data had been compiled on the fungus's effect on various plastic products and their decomposition rates under different environmental conditions.

And the three major corporations meeting in Tokyo today had also obtained the data they sought.

These three companies were: America's Tyco Company, France's Alcatel-Lucent, and East Japan's NEC.

Many people might not know what they do, as their products rarely appear directly in daily life. However, anyone who has ever used a computer or a mobile phone has indirectly used products from these three companies.

Tyco Company, Alcatel-Lucent, and NEC were the three giants of the global submarine cable industry, responsible for constructing nearly 90% of the world's subsea fiber optic and electrical cables.

However, this data reflected the landscape before Homo Sapiens Company was formally established.

After Homo Sapiens Company officially debuted last year, it formed the Coral Sea Cable Company, which was specifically responsible for constructing submarine cable projects within the company's territory and its affiliated regions.

Because Europe and America were extremely hostile toward the Homo sapiens, they would almost never award submarine cable projects to Coral Sea Cable, which allowed the three major cable giants to barely hold on to their core market.

But this time, as soon as the assessment report on the Tokyo Fungus was released, the top executives of Tyco Company, Alcatel-Lucent, and NEC hastily convened a secret meeting in Tokyo.

Inside the NEC headquarters building.

The atmosphere in the conference room was heavy and oppressive.

As the host, NEC President Takeda Nobuyoshi wore a very serious expression. "Gentlemen, you've all seen the results of the assessment report. The rate at which the fungus corrodes the plastic protective layer of submarine cables, while slower than in tropical regions, is still something we cannot afford to ignore."

Currently, the plastic protective layers they commonly used on submarine cables could only last for six to eight years when fully exposed on the seabed.

If that were the only issue, Tyco Company, Alcatel-Lucent, and NEC wouldn't be so concerned.

The problem was that the most vulnerable areas were not in the easily replaceable shallow sea regions, but on the seabed at depths exceeding 500 meters.

The reason for this situation was mainly related to the method used for laying submarine cables.

In shallow sea regions, submarine cables are typically buried to prevent them from being easily discovered or severed by ship anchors. A layer of sand and silt covers the cable.

It was precisely because of this layer of sediment that the corrosion rate of the submarine cables by the fungus was drastically reduced, allowing them to last for approximately 20 to 30 years.

This timeframe is already close to the normal lifespan of a submarine cable, so naturally, it wasn't a major concern.

The real problem lay with the submarine cables in the deep sea. Because these deep-sea cables are laid directly on the seabed and exposed to the seawater with no sediment to cover them, the fungus can use the oxygen and minerals in the water to multiply rapidly on the plastic protective layer.

Tyco Company President Thales adjusted his glasses. "We have no way to use burial techniques for submarine cables at depths greater than 500 meters."

Even if they borrowed a nuclear submarine from the United States Army, its maximum operating depth is only about 1,200 meters.

And some submarine cables needed to pass through ultra-deep sea regions like the Luzon Trench, the Mariana Trench, and the Solomon Trench.

Unless they were willing to redesign the routes, converting them all to shallow-sea paths.

The problem was that the consequences of doing so would be an explosion in costs, and it would also leave some regions unable to be connected by submarine cables.

Takeda Nobuyoshi looked at the others, his head throbbing, hoping they could come up with a solution. Otherwise, they could forget about any submarine cable orders this year.

One of the NEC executives said, a little uncertainly, "I heard that the Homo sapiens have developed a type of engineering submarine that can operate at depths of around 3,000 meters."

"Heh, even if such a submarine exists, do you think Homo Sapiens Company would sell it to us?" Thales retorted with a cold laugh.

The conference room instantly fell silent.

After a moment, Alcatel-Lucent's president, Henry Peran, tapped the table. "Can we improve the material of the plastic protective layer to achieve an anti-fungal effect?"

The head of NEC's R&D department thought for a moment. "Among the currently known chemicals that can effectively inhibit this fungus's reproduction are potassium permanganate and copper hydroxide. Potassium permanganate is water-soluble, and copper hydroxide easily decomposes with heat. Neither is suitable as an anti-microbial agent for submarine cables."

Thales gritted his teeth. "Damn it! This fungus appeared so suddenly."

The executives from the three companies discussed for a long time but still couldn't come up with a solution.

The engineering solutions involved either taking detours or required deep-sea engineering submarines.

As for the anti-microbial plastic solution, there was currently no suitable agent.

All they could do now was watch as the terrestrial cable and fiber optic manufacturers feasted, while they couldn't even get a sip of the soup. The feeling was unbearable.

Last year, internet giants like Google, Microsoft, and Facebook had started to roll out their submarine cable businesses, preparing to recover through self-operated ventures and further expand their commercial empires.

These internet giants didn't have the capability to lay submarine cables themselves, so they had no choice but to put the work out to tender and outsource it.

Tyco Company, Alcatel-Lucent, and NEC had been eyeing this lucrative prize since last year, frequently contacting Google and the other internet giants in hopes of securing these submarine cable projects.

Unfortunately, fate had other plans. The appearance of the Tokyo Fungus had completely devastated the global plastics industry.

Coupled with the after-effects of the economic crisis, the internet giants had become even more cautious about their submarine cable deployments.

The fact that the plastic protective layers of deep-sea submarine cables could only last for six to eight years made the companies that operated them extremely anxious and conflicted.

After all, they wanted to make repairs now, but there was no solution to extend the lifespan of the plastic protective layers.

But if they didn't make repairs, waiting six or seven years would only make the concentrated repair efforts even more troublesome.

For terrestrial cable retrofitting, many regions had already found a solution: mixing copper hydroxide with paint and applying it to the cable surface. As long as this special paint was reapplied periodically, the cable's plastic sheathing wouldn't need to be replaced, extending its lifespan to about 15 to 17 years.

In the colder mid-to-high latitude regions, this could even extend the lifespan to around 30 years.

The reason it couldn't exceed 30 years was mainly that the plastic itself would age. The plastic casing of a wire that has been in use for about 30 years is basically ready to be scrapped.

But submarine cables were different from terrestrial ones. The various components in seawater could easily cause the copper hydroxide to decompose, leading to the failure of the anti-microbial coating.

This situation was a major headache for Tyco Company, Alcatel-Lucent, and NEC. Even after investing significant R&D funds, they still hadn't come up with a cost-effective solution.

As long as the fungus corrosion problem remained unsolved, they could forget about getting any projects. After all, the companies operating the submarine cables weren't fools with money to burn.

Right now, all the major submarine cable operating companies were adopting a wait-and-see approach, unwilling to build any more subsea cables at this time.

This had resulted in Tyco Company, Alcatel-Lucent, and NEC not signing a single engineering project in the last six months.

As private enterprises, they weren't a mega-corporation of the Homo sapiens' kind; they had no way to sustain themselves through an internal circular economy.

Just then, an NEC employee rushed in and whispered a few words in President Takeda Nobuyoshi's ear.

Takeda Nobuyoshi's expression changed drastically.

If you find any errors (non-standard content, ads redirect, broken links, etc..), Please let us know so we can fix it as soon as possible.

Report

Use arrow keys (or A / D) to PREV/NEXT chapter