Building The First Adventurer Guild In Another World
Chapter 603: Building Beyond the Capital
Several days had passed since Tobias Merrow returned to Kingsford alongside Marcelline Dacre and the other members of the Guild’s delegation.
With the first regional branch agreement successfully concluded and Guildmaster Sage’s authorization secured, the Logistics Department had begun preparing for the construction project.
What initially appeared to be a straightforward undertaking had quickly developed into a complicated operation involving construction companies, transportation merchants, craftsmen, and suppliers spread across two regions.
------
The administrative wing of the Adventurer Guild Headquarters had become considerably busier since the signing of its first regional branch agreement.
Documents arrived almost hourly, ranging from construction estimates and merchant quotations to employment applications and requests for transportation contracts.
For Tobias Merrow, who had been entrusted with coordinating the project, the real work was only beginning.
That morning, Tobias stood before a large table in his office, examining the architectural plans for the proposed branch.
Several documents were arranged beside them, including a preliminary construction schedule, a list of required materials, and the property survey submitted by the regional administration.
Although the agreement had secured the Guild’s right to develop the land, the actual construction would require careful coordination between numerous departments.
A knock interrupted his examination.
"Come in," Tobias called, looking toward the door as one of his assistants entered carrying another stack of documents.
"Mr. Merrow, the updated quotations from the construction companies have arrived," the assistant reported, placing the papers upon his desk. "Two contractors have submitted revised estimates, but the third is requesting additional information concerning the storage facilities."
Tobias accepted the documents with a weary sigh. "Tell the third contractor that the storage specifications haven’t changed. The measurements are included in the architectural plans we sent yesterday. If they require clarification, they can submit their questions in writing."
The assistant nodded and departed, leaving Tobias to examine the quotations.
The Guild’s standard branch design appeared straightforward on paper. It included a reception hall, Mission Boards, administrative offices, storage rooms, staff facilities, and enough surrounding land for future development.
However, constructing those facilities in another region presented complications that had never appeared in the initial drawings.
By midmorning, Tobias arrived at Sage’s office with his preliminary construction report.
Sage was reviewing several regional documents when Tobias entered.
"Guildmaster, I’ve completed the first assessment of our construction requirements," Tobias announced, placing the report upon the desk. "The property is suitable, but we’ll need to coordinate several separate contracts before work can begin."
Sage set aside his papers. "What are our biggest concerns?"
"Transportation and scheduling," Tobias replied, opening the report. "The regional capital has capable craftsmen and suppliers, but not everything we require is available locally. Certain equipment, reinforced fittings, and specialized materials will need to be transported from Kingsford or purchased through established merchants."
Sage examined the itemized estimates. "Can we use local contractors for most of the construction?"
"Yes, Guildmaster. That would reduce transportation expenses considerably," Tobias explained. "However, we’ll need someone supervising the work to ensure the finished facilities meet our requirements. I recommend appointing a construction overseer who reports directly to my department."
Sage nodded. "Approved. Select someone experienced and make sure the reporting procedures are clear. I don’t want you traveling between Kingsford and the construction site every time someone needs a decision."
Tobias smiled faintly. "That was my intention, Guildmaster. There are enough problems here to keep me occupied."
After receiving Sage’s approval, Tobias returned to the administrative wing and began arranging a departmental meeting.
Bramdir Coppervein, Selene Arkwright, and Maura Bellamy arrived shortly afterward, each carrying notes concerning their respective facilities.
Tobias spread the architectural plans across the table.
"I’ve asked you here because construction will begin soon, and I need your requirements finalized before the contractors start working," Tobias explained. "Making changes after the foundations are completed will cost considerably more than addressing them now."
Bramdir immediately examined the section reserved for future workshops.
"You’re planning to leave the smithing facilities for a later stage?" Bramdir asked, stroking his beard.
"That’s the current proposal," Tobias replied. "The first stage will focus on essential Guild operations. However, we’re reserving space for workshops and other facilities once demand justifies their construction."
Bramdir considered the arrangement before pointing toward the eastern side of the property.
"Then make sure the workshop area is positioned away from the accommodation buildings," Bramdir advised. "Forges produce heat, smoke, and noise. We also need suitable access for deliveries of ore, charcoal, and finished equipment."
Tobias marked the proposed location. "Would that area provide enough room for future expansion?"
"For a modest smithing department, certainly," Bramdir replied. "But the foundations should account for heavy equipment, and we’ll need proper ventilation. I don’t want someone building an ordinary storeroom and expecting us to turn it into a forge afterward."
Tobias recorded the requirements before turning toward Selene.
"What about accommodation?"
Selene unfolded a separate plan showing several possible room arrangements.
"I recommend starting with staff accommodation rather than constructing a full Adventurer hotel immediately," Selene explained. "The branch will require administrators, reception personnel, security staff, and maintenance workers. Some may be recruited locally, but others will need temporary or permanent lodging."
Maura examined the plan. "And construction workers will need somewhere to stay before the branch is completed."
"Exactly," Selene replied. "We should arrange temporary accommodation in the city during construction. Once the staff quarters are finished, we can gradually transfer our employees there."
Tobias nodded thoughtfully. "I’ll contact several local inns and request quotations for extended stays. We may be able to negotiate lower rates if we’re reserving multiple rooms for several weeks."
Selene added another recommendation. "Don’t forget sanitation, laundry facilities, and storage for bedding. Those expenses are easy to overlook when everyone is concentrating on the buildings themselves."
Tobias made another note before looking toward Maura.
"And what does the dining department require?"
Maura placed her own list upon the table.
"Initially, we’ll need a modest kitchen capable of preparing meals for employees and a limited number of Adventurers," Maura explained. "But the kitchen should be designed so its capacity can increase later. We’ll also need reliable suppliers for grain, vegetables, meat, cooking fuel, and clean water."
Tobias examined the list. "Can those supplies be purchased locally?"
"Most of them should be available in the regional markets," Maura answered. "However, I want someone to inspect the suppliers before we sign any long-term contracts. Cheap ingredients won’t save us money if deliveries are unreliable or the quality is poor."
Bramdir chuckled. "Sounds like the kitchen might be more complicated than my forge."
Maura gave him an amused look. "Your forge doesn’t have to feed hungry Adventurers three times a day, Bramdir."
Their discussion continued for another hour as Tobias recorded the departments’ requirements and adjusted the construction priorities.
By the time the meeting concluded, the project had become considerably more detailed than the original architectural proposal.
The branch would require not only buildings but also employees, equipment, supplies, maintenance arrangements, and reliable communication with Kingsford Headquarters.
Later that afternoon, Tobias met with Irene Valcrest to review the revised expenses.
Irene examined the growing list of projected costs with a thoughtful expression.
"Your estimates have increased since yesterday," Irene observed, turning another page.
Tobias nodded. "We’ve included several requirements that weren’t covered in the original construction quotations. Temporary accommodation, storage facilities, equipment transportation, and additional site preparation are responsible for most of the increase."
Irene studied the figures carefully. "I’m not opposed to necessary expenses, but we need to distinguish between essential requirements and improvements that can wait until the branch begins generating revenue."
"I’ve already separated them into construction stages," Tobias replied. "The first stage covers the reception hall, administrative offices, storage, staff facilities, and basic security arrangements. Everything else can be developed according to demand."
Irene nodded approvingly. "That should make the financial commitments easier to manage. I’ll authorize the initial payments once the contracts have been reviewed and approved."
Tobias thanked her before returning to his office, where another collection of documents awaited him.
By evening, he had finalized arrangements with two construction companies, shortlisted several local suppliers, and prepared transportation schedules for materials that needed to be delivered from Kingsford.
The first shipments were expected to depart within the week.
However, one problem remained.
Several specialized construction materials had been ordered through a merchant company responsible for transporting goods between Kingsford and the western commercial regions. The shipment included reinforced structural fittings, iron components, and equipment required during the early stages of construction.
Without those materials, certain portions of the project could not proceed according to schedule.
Tobias had been assured that the delivery would arrive before the contractors began their work.
The following morning, while reviewing the final transportation arrangements, Tobias received an unexpected visitor.
A merchant named Alden Fischer entered his office with a troubled expression. He represented the trading company contracted to deliver the Guild’s specialized construction materials.
"Mr. Merrow, I’m afraid there’s been a complication with your shipment," Fischer began, removing his hat.
Tobias looked up from his documents. "What kind of complication?"
Fischer hesitated before answering. "The materials were supposed to leave our distribution warehouse yesterday, but the transport company has informed us that the shipment cannot proceed as scheduled."
Tobias frowned. "Why not? The transportation contract was confirmed several days ago."
"That’s what I’m trying to determine," Fischer replied. "Their representatives claim there are difficulties concerning the availability of suitable wagons and escorts. However, they haven’t provided a satisfactory explanation."
Tobias placed his pen upon the desk. "How long will the shipment be delayed?"
Fischer shifted uncomfortably. "They haven’t given us a definite date, Mr. Merrow. At present, all they’ve said is that transportation arrangements are being reconsidered."
Tobias’s expression darkened.
A delay of several days could be managed, but an indefinite postponement threatened to disrupt the construction schedule before the first foundation was laid.
"Contact the transport company again and request a written explanation," Tobias instructed firmly. "I also want to know whether alternative carriers are available. We have a signed agreement, and I expect its terms to be honored."
Fischer nodded quickly. "I’ll make those inquiries immediately."
After the merchant departed, Tobias examined the transportation schedule spread across his desk.
Everything had been arranged carefully, from the arrival of construction workers to the delivery of essential equipment.
Yet one unexpected delay now threatened to interfere with the entire project.
And as Tobias reached for the contract, he couldn’t help wondering why a shipment that had already been confirmed was suddenly proving so difficult to transport.
If you find any errors (non-standard content, ads redirect, broken links, etc..), Please let us know so we can fix it as soon as possible.
ReportUse arrow keys (or A / D) to PREV/NEXT chapter
Loading comments…